Kanban
Use the Kanban methodology to design an efficient and productive workflow.
In this guide we'll explain the benefits of using a kanban system when working with a team. Then we'll show you how to set up a simple board you can modify based on your particular needs.
It's very likely you've used a Kanban board before but weren't aware of the broader Kanban methodology. By following just a few simple rules, the Kanban system can help you increase your team's workflow efficiency and productivity.
What is Kanban?
Origin The Kanban methodology was originally developed by Toyota in Japan in the 1950s by the engineer Taiichi Ohno after observing how American supermarkets stocked their shelves. Customers would take items from the shelf when purchasing and then the supermarket would fill in the missing product.
The rate of demand determines the rate of production. As items are removed from the shelf, that signal is passed along to the store and then to the supplier. The supplier knows what to produce and how much based on demand, so no excess inventory is built up and production stays efficient.

Cards being pulled across the kanban board as empty slots become available
That same idea has since been adapted to the world of software engineering but the core principles can be applied to pretty much any team endeavor.
Benefits There are several benefits to adopting the Kanban methodology within your team.
- Increased transparency: Everyone on the team can easily see the overall status and amount of work.
- Improved collaboration: Team members can see where issues arise and foster continuous improvement.
- Improved focus: Work in progress is limited, so tasks must be chosen carefully.
- Increased quality: Multitasking is discouraged, so team members have fewer things to think about or be distracted by.
Now let's get started setting up your first kanban board.
Setting up your kanban board
The first thing we need to do is create our board and figure out what columns we'll use. In the Kanban system, the columns represent different stages of work.
Setting the columns In a very simple Kanban setup, you can use "Todo", "Doing", and "Done" for your columns. Cards start on the left side of the board and are pulled to the right once there is enough bandwidth to work on them.

An example of the basic "Todo", "Doing", "Done" Kanban board columns
In this simple example, our columns only indicate what stage each task is currently at. However, if the work you're doing is highly connected where one team member is handing off a task or client to another person on your team, then you could also label your columns based on the type of work being done at each stage.
If, for example, you're designing websites for clients, you could instead use labels like "Backlog", "Design", "Code", "Test", and "Done". In this example, cards are pulled to the right as the designer, engineer, and tester have open slots for new tasks.

Another possible column setup in a kanban board
The cards Once you've decided on the labels for the board, the next step is to add some cards.
All new cards should start in a queue in the far-left column. That's why we labeled the first column "Todo" or "Backlog" in our examples. This is where all new tasks begin. The information you put on the cards will depend on your use case, but we recommend adding a short, descriptive title, any details required to start the work, and a due date if there is one.
How much work each card represents is not an exact science. On the one hand you don't want to make cards for every single step in a task, but you also don't want a card to represent a project that will take weeks.
As a starting point, try to make sure each card takes roughly a day to complete, that is, to move on to the next column. As time goes on you'll get a feel for roughly how much work each card should represent.
The reason you don't want the cards too granular is because then creating cards will become a job of its own. And you also don't want cards that represent weeks of work because the card will move across the board at a snail's pace, making it hard to get a sense of the day-to-day cadence.
Using your kanban board
Pulling vs pushing By now you should have your board and your first cards all set. The way items move across the kanban board is via a pull-based approach. This means that unlike other systems where one person like a manager simply assigns tasks to team members, in a pull-based system the person that will perform the task is the one that assigns it to themselves.
What makes this approach useful is that tasks are only started when there is enough capacity to handle them. There's no point in assigning more work to a person or a team than they can realistically get done. A pull-based approach ensures quality is maintained and deadlines are more likely to be met.
Limiting work in progress Another key idea in Kanban is to make sure that each column, other than the starting queue and the finished column, has a work-in-progress (WIP) limit. A WIP limit is the maximum number of tasks that can go into a column. Once that limit is reached, no new items can enter the column until a spot opens up.

Columns with work-in-progress (WIP) limits
This number will depend on the type of workflow you have, the number of team members, and the complexity of the work. In general, a good WIP limit is one that is low enough to prevent the team from becoming overwhelmed with too much work, but high enough to ensure that work is not stuck and is flowing through the board efficiently.
The goal is to find a balance between too much work-in-progress and too little work-in-progress, so that work is completed in a timely and efficient manner.
Establishing a cadence As you and your team start to use your board, you'll want to introduce some sort of regular meeting to review the workflow. It's good to do this daily in the beginning to see if you need to make any adjustments to the columns, the information on the cards, the work in process limit, or anything else.
It's important to keep in mind that the kanban methodology is about continuous improvement so changes are to be expected. Experimentation is also encouraged to find the optimal setup for your team - one where tasks are progressing with regularity and the team is being well utilized without being overloaded.
Moving cards backwards One situation you're almost guaranteed to encounter is where a previous step is incomplete or a new requirement makes you think you should move a card backwards.
If a card needs to move back a column, that usually signals an issue in your process. Maybe you need an additional column, or perhaps some information was missing at the beginning that would have prevented this from happening. Treat this as a learning opportunity and analyze it so it's less likely to happen again.
If there seems to be no alternative to moving the card back, we recommend leaving it where it is and creating a new task with the actions necessary to unblock it. Otherwise, the team might be tempted to move the card back and forth as new issues arise and are solved.

A task under the "Code" column that is blocked and a new card under "Backlog" that is ready to go
This forces the problematic card to take a space on the board and get the team to focus on unblocking it. One thing you can do is tag the pesky card with #blocked and the new card with #unblocker so the relationship between the two is clear to everyone on the team.
Conclusion
And there you have it. Far from being a mysterious and arcane system, the kanban methodology is logical and simple to implement.
As with any new system you introduce to your team, there will be an initial adjustment period, but the benefits are well worth it. With its focus on a highly visual and transparent workflow, the Kanban system fosters collaboration and discussion as your team continuously improves it.
In addition, introducing a pull-based system gives team members more ownership over their work and allows them to focus on just a few tasks at any given time - which tends to lead to higher quality work overall.